 The Operator should take the following actions after power is restored: The Operator should take the following actions after power is restored:
  
-1)     ​Silence any alarms that have activated+1)     ​Silence any alarms that have activated, E1/E2, shutdown module, tritium monitor.
  
 2)  Note how long the power was out. 2)  Note how long the power was out.
playground/powerout.1445022561.txt.gz ยท Last modified: 2015/10/16 15:09 by jacobs